LIVE VIDEO: Morning News    Watch
 

Expect construction delays across the metro this weekend

3:55 PM, Apr 12, 2013   |    comments
  • Share
  • Print
  • - A A A +

ATLANTA -- Some major construction is scheduled for this weekend, meaning drivers should expect possible delays on several major freeways.

Construction continues on  GA400 for both the new I-85/GA400 interchange and the MARTA pedestrian bridge project. 

All closures are the left lane on SB GA400 at Lenox Rd.  Friday double lane closures will be from 8:00 p.m. to 11:00 a.m. Saturday morning.   Saturday double lane closures occur 8:00 p.m. to 11:00 a.m. Sunday morning

At the I-85/GA400 Interchange, there will be closures both North and South near Sidney Marcus.

There is also work scheduled on I-285. 

I-285 EB from MP 22.0 (Northside Dr) to MP 25.0 (Roswell Rd)
9 pm Fri - 5 am Mon (Continuous)
3 right lanes

I-285 EB from MP 24.0 (Riverside Dr) to MP 29.0 (Ashford-Dunwoody Rd)
9 pm Fri - 5 am Mon (Continuous)
3 left lanes

I-285 WB from MP 22.0 (Northside Dr) to MP 18.0 (Paces Ferry Rd)
9 pm Fri - 5 am Mon (Continuous)
3 left lanes

I-285 NB from MP 18.0 (Paces Ferry Rd) to MP 22.0 (Northside Dr)
9 pm Fri - 5 am Mon (Continuous)
2 left lanes

I-285 EB from MP 20.0 (I-75 SB) to MP 20.0 (I-75 SB)
7 am Sat - 5 am Mon (Continuous)
1 right lane - Ramp

Here are the other construction projects for this weekend by county:

Clayton
I-75 NB from MP 233.0 (Jonesboro Rd) to MP 238.0 (I-285)
9 pm Fri - 4 am Mon (Daily)
1 left lane (Rolling Closure)

I-75 SB from MP 238.0 (I-285) to MP 233.0 (Jonesboro Rd)
9 pm Fri - 4 am Mon (Daily)
1 left lane (Rolling Closure)

Cobb
I-75 NB from MP 259.0 (I-285 EB) to MP 259.0 (I-285 EB)
10 am Sat - 5 am Mon (Continuous)
Ramp 1 right lane

I-75 SB at MP 260.0 (Windy Hill Rd)
1pm Sat - 5 am Mon (Continuous)
Entrance Ramp
I-285 WB from MP 20.0 (I-75 SB) to MP 20.0 (I-75 SB)
7 am Sat - 5 am Mon (Continuous)
1 left lane - Ramp

I-285 EB from MP 0.0 (Cumberland Blvd) to MP 20.0 (I-75 SB)
10 am Sat - 5 am Mon (Continuous)
Entrance Ramp

I-285 EB at MP 0.0 (Windy Hill Rd)
3 pm Sat -5 am Mon (Continuous)
Entrance Ramp

I-285 WB at MP 0.0 (Windy Hill Rd)
3 pm Sat -5 am Mon (Continuous)
Entrance Ramp

DeKalb 
I-285 WB from MP 30.0 (Chamblee Dunwoody Rd) to MP 24.0 (Riverside Dr)
9 pm Fri - 5 am Mon (Continuous)
3 left lanes

Fulton
SR 400 NB at MP 0.0 (I-85) to MP 0.70 (Sidney Marcus Blvd )
24 Continuous Fri-Mon
1 right lane

SR 400 SB at MP 1.0 (Peachtree Rd) to MP 0.0 (Lindbergh Dr)
9 pm Fri - 12 pm Sat
1 right lane-Traffic Pace

SR 400 NB at MP 2.0 (Sidney Marcus Blvd) to MP 3.0 (Lenox Rd)
8 pm Fri - 5 am Sun (Continuous)
2 left lanes - Traffic Pace

SR 400 SB at MP 3.0 (Lenox Rd) to MP 2.0 (Sidney Marcus Blvd)
8 pm - 12 noon - Traffic Pace
2 left lanes

I-85 NB from MP 0.0 (Lindbergh Dr) to MP 0.25 (Lindbergh Dr)
24 Continuous Fri-Mon (until 7/21/2013)
Entrance Ramp

I-85 SB from MP 0.25 (Lindbergh Dr) to MP 0.0 (Lindbergh Dr)
24 Continuous Fri-Mon (until 7/21/2013)
HOV Exit Ramp

Fulton/Coweta
I-85 SB from MP 76.0 (Cleveland Ave) to MP 57.2 (1.2 mi North of Collinsworth Rd)
9 am Sat - 4 pm Sun (Daily)
1 left lane

Most Watched Videos